Unbranded SUV liftgate application in a dark automotive setting

OEM / ODM power liftgate supplier

Power Liftgate Engineering and Manufacturing

Application-specific development, validation and scalable production for automotive programs.

2009Founded
15,000 m²Facility
120Employees
399Catalog records

A focused engagement model

From application data to a controlled production path.

LIFENG brings engineering, validation and manufacturing preparation into one legible program flow, with a practical review point at every stage.

01

Engineering

Sample analysis, dimensional measurement, application interfaces and design development.

Explore
02

Validation

Requirement-led durability, environmental, force, corrosion and operating-noise verification.

Explore
03

Manufacturing

Structured assembly, controlled material flow and staged production capacity.

Explore
04

Application Support

Searchable technical records and a direct route for application-specific discussion.

Explore

Program sequence

From sample to production

A disciplined sequence keeps technical decisions visible before manufacturing preparation begins.

Sample analysis

Register the sample and clarify the intended application.

Engineering & design

Define interfaces, packaging and product direction.

Validation & testing

Plan requirements and verification conditions.

Manufacturing preparation

Set process controls, material flow and readiness.

Volume production

Operate the approved program through controlled assembly.

Precision measurement room used as a LIFENG marketing visual
Measurement & validation environment

Quality snapshot

Requirements remain visible.

Program validation is structured around published requirements, not unsupported test-result claims.

30,000 cycles20,000 ambient + 5,000 at −30°C + 5,000 at 80°C

≥3,000 NRequirement, not a published test result

240 hoursRequirement

<55 dBRequirement

Explore validation

Production readiness

Staged capacity, explicit status.

Operational and planned states are kept separate so sourcing teams can have a transparent capacity discussion.

01

Operational

PLG Assembly Line 1

Launched production line.

150,000 pieces/yearLaunched · Sep 2025
02

Operational

PLG Assembly Line 2

Launched production line.

150,000 pieces/yearLaunched · Jul 2026
03

Planned

PLG Assembly Line 3

Capacity planning visual; not an installed line.

150,000 pieces/yearPlanned · Dec 2026

Application support

Find a technical record.

Search the supplied application catalog by LIFENG product number, OE number or vehicle application. Each record leads to a technical-data enquiry rather than a checkout.

Search applications
Automated assembly line marketing visual
Structured assembly process

Start a conversation

Bring your PLG program into focus.

Share your sample and application context. We will confirm the appropriate engineering, quality, or factory-audit next step.